Journal of architectural history Vol.26 No.4 pp.19-34
DOI : https://doi.org/10.7738/JAH.2017.26.4.019
DOI : https://doi.org/10.7738/JAH.2017.26.4.019
A Study on the Assignment and the Procurement Method of Wood Works’ Craftsman in Royal Tombs Constructions in the Late Joseon Period
Abstract
The purpose of this study was to comprehend the assignment and the procurement method of wood works’ craftsman through the Salleung-dogamuigwes in royal tombs constructions in the late Joseon period. Following conclusions have been reached through the study. First, Carpenter and other nine craftsmen were introduced in carpentry works. The craftsmen were put in by occupation to maintain the quality of the government building construction by wood processing area. It was distinguished by frame member, Sujangjae, window framing wood, decorative member. Second, sawyer showed a sharp increase in the latter half of the 18th century and declined since the middle of the 19th century. This is closely related to the increase in demand for building materials and the growth of civilian wood products. As a maximum of 300 people have been assigned to the craftsmen in the woodwork, it can be seen that the work has been divided by the process. Third, the national carpenter was difficult to procure from the 17th century to the beginning of the 18th century. From the middle 18th century, the system procuring national carpenter was stabilized. In the 19th century, the input ratio of the national craftsmen seems to have decreased significantly and seems to have kept it at the minimum level. Forth, sawyer were procured through Seongonggam from the late 18th century through the mid 19th century. That means that the role of the sawyer had become important. Since Jogakjang is not a necessary manpower, it usually has civilian artisans.